What to Know About Concrete Before Applying a Floor Coating in Boston, MA

by | Mar 24, 2020 | Flooring

Top Stories

Categories

Archives

It is important for concrete in a garage to be prepped before applying a coating to it. This is true even if the concrete is new. If the concrete was recently poured, a homeowner will have to wait before a coating can be applied. It needs to be at least 28 days old. It also needs to be free of moisture. There are moisture test kits that homeowners can buy to be sure that the concrete is ready to have a coating applied.

When a person works with a company that offers custom garage flooring in Boston, MA, the professional will recommend steps that can be taken to get concrete ready to have coatings applied. If the concrete is soft, dusty, or chalky, the coating may not adhere. The garage floor professional may recommend grinding to take the top layer off and get it ready to be coated.

Something that homeowners often ask a professional that offers custom garage flooring in Boston, MA, as if the saw cuts or expansion joints need to be filled before having a coating applied. It is good to remember that these joints are there for a reason. They are in place to control the cracking in the concrete. If a homeowner does fill in the joints, they should use a joint filler. If there are cracks, they should be repaired with the proper material. The joint filler should not be used on cracks.

Quality epoxy flooring installations and garage organization systems are offered by Saulnier Epoxy Floors in Boston, MA. Get in touch with them.